-
Recent Posts
Archives
- May 2017
- March 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- July 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- August 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- April 2013
- March 2013
- February 2013
- January 2013
- December 2012
- November 2012
- October 2012
- September 2012
- August 2012
- July 2012
- June 2012
- May 2012
- April 2012
- March 2012
- February 2012
- January 2012
- December 2011
- November 2011
- October 2011
- September 2011
- August 2011
- July 2011
- June 2011
- May 2011
- April 2011
Categories
Meta
-
Join 705 other subscribers
Monthly Archives: June 2013
Basic Air Conditioning Piping Recommendations – Suction Lines – Part 2
Okay — hopefully I’ve made my point that the two factors — suction line pressure loss and suction line velocity –are the most important parts of sizing suction lines for any air conditioning system — either residential of commercial. After my … Continue reading
Posted in HVAC Tech Support
Tagged cooling, piping, refrigerants, retrofit, service, technology
9 Comments
Basic Air Conditioning Piping Recommendations – Suction Lines – Part 1
In my last post, I mentioned orientation of the equipment and that it can affect how we size a line set. Before I discuss the various orientations, it is important to understand a few things about suction and liquid lines. … Continue reading
Basic Air Conditioning Piping Recommendations – Introduction
A split system air conditioner consist of more than the box sitting outside. That is just one component of an entire system. Since this is a system, specific application considerations are required with regards to the rest of the system — … Continue reading
Control Boards and Flash Code Diagnostics Follow-up
In my last post I mentioned that — later this morning I am going out to meet a tech at a job site where the company has replaced 3 of the same control boards in the first 7 months since … Continue reading →